1970 TRANS-AM: Bud Moore Mustangs Canvas
$4000
Unit price
/
Unavailable
1970 TRANS-AM: Bud Moore Mustangs
Elkhart Lake, Wisconsin, July 19, 1970. The Trans-Am field gets the 1-minute signal before the start.
George Follmer (No. 16 Bud Moore Engineering Ford Mustang Boss 302, pole) and Parnelli Jones (No. 15 Bud Moore Engineering Ford Mustang Boss 302) on the front row.
Elkhart Lake, Wisconsin, July 19, 1970. The Trans-Am field gets the 1-minute signal before the start.
George Follmer (No. 16 Bud Moore Engineering Ford Mustang Boss 302, pole) and Parnelli Jones (No. 15 Bud Moore Engineering Ford Mustang Boss 302) on the front row.